Case study · Hotel / Hospitality
Failing benchmark to
first-pass AHJ approval
AC Hotel Ann Arbor, a 7-floor hotel in Ann Arbor, Michigan, failed its public-safety benchmark grid test — legally triggering an ERCES. WZC took it to full code coverage, approved on the first inspection.
The project
Engineered to passthe first inspection
When AC Hotel Ann Arbor failed its public-safety benchmark grid test, the failure legally triggered an ERCES requirement. WZC ran the full process from there: predictive iBwave design and direct fire-marshal coordination, so the system on paper was the system the AHJ expected to see.
The installed system is a COMBA CriticalPoint Class A BDA feeding 54 ceiling dome antennas across 81,706 sq ft, backed by a 33.9-hour LiFePO4 battery system.
The acceptance grid test proved 95% general and 99% critical-area coverage with margin — earning first-pass AHJ approval with zero punchlist items.

- Predictive iBwave design with fire-marshal coordination
- COMBA CriticalPoint Class A BDA, 54 ceiling dome antennas
- 33.9-hour LiFePO4 battery backup system
- Acceptance grid test passed with margin — zero punchlist