Case study · Healthcare

ERCES through MRI shielding & JCAHO compliance

Novi Medical Center presented MRI shielding that defeats public-safety RF. WZC engineered a six-sector ERCES that meets both JCAHO and IFC 510 — delivered in three weeks with first-pass AHJ approval.

Explore Public Safety DAS

  • 6 coverage sectors
  • JCAHO + IFC 510 compliant
  • Three-week delivery · first-pass AHJ approval

Coverage engineered around MRI shielding

MRI suites are built to keep RF out — the same shielding that protects imaging equipment also defeats public-safety radio signal. At Novi Medical Center, that made ordinary ERCES design impossible and demanded an engineering answer.

WZC's answer was a six-sector ERCES design on the COMBA CriticalPoint platform, sectorized so first-responder coverage holds throughout the facility despite the shielded imaging environment.

The design had to satisfy two rulebooks at once — JCAHO healthcare accreditation requirements and IFC 510 fire code. WZC met both, completed the project in three weeks, and earned full first-pass AHJ approval.

All case studies

COMBA CriticalPoint ERCES — head-end engineered around MRI shielding

6

Coverage sectors

3 wk

Project timeline

1st

Pass AHJ approval

  • Six-sector ERCES design engineered around MRI shielding
  • Built on the COMBA CriticalPoint platform
  • Meets both JCAHO and IFC 510 requirements
  • Completed in three weeks with full first-pass AHJ approval

Six sectors around a shielded core

The Novi Medical Center design — six ERCES sectors on the COMBA CriticalPoint platform, engineered so first-responder coverage holds despite the RF-shielded imaging suite.

  • Six sectorized coverage zones S1–S6 — signal holds around the shielded suite
  • MRI suite — RF shielded
  • UL 2524 BDA feeding every sector
  • JCAHO + IFC 510
  • 3 weeks · first-pass AHJ

Want results like these?

Tell us about your building and goals, we'll map the fastest path to a working, compliant network.

Or call 248-946-4000.